MARCO POLO AIRPORT IN VENICE – PHOTOVOLTAIC SYSTEM

STEAM was commissioned by Save Spa to write up the project for the construction of a photovoltaic plant with a peak power of 612.9 kWp, positioned on the roof of Old Terminal ‘s Marco Polo airport.Design elements can be listed as follows:

  • photovoltaic generator;conversion facility CC / CA;
  • transformer substation and connection to the existing F1 MV network;
  • facilities at the cabin service transformation F1;
  • water system for washing of photovoltaic panels;
  • building the rehabilitation work of the premises dedicated to the cabin F1.

The plant was successfully achieved thanks to the careful supervision of STEAM team.