STEAM was commissioned by Save Spa to write up the project for the construction of a photovoltaic plant with a peak power of 612.9 kWp, positioned on the roof of Old Terminal ‘s Marco Polo airport.Design elements can be listed as follows:
- photovoltaic generator;conversion facility CC / CA;
- transformer substation and connection to the existing F1 MV network;
- facilities at the cabin service transformation F1;
- water system for washing of photovoltaic panels;
- building the rehabilitation work of the premises dedicated to the cabin F1.
The plant was successfully achieved thanks to the careful supervision of STEAM team.
- Location: Venice
- Client: Save SpA
- Years: 2010
- Steam activities: Detailed design and supervision of works