You are here:

Steam in charge of the Supervision of Works of the extension of the passenger terminal for “Pier South” extra-Shenghen flights at Marco Polo airport in Venice

The works have a total value of around 19 million euros.
Among the first practical cases in Italy, the whole process will be managed with a BIM methodology, through a digital sharing platform able to manage and monitor in real time each construction step: control of the constructive design, proposal and approval of materials, verification of the AS-Built and preparation of maintenance plan.